Except the scaffold pipe, safety net and baffle are provided by Party A, Party B shall be responsible for the construction, disassembly and transportation of the supporting system, and the formwork supporting system is not limited by the type of scaffold. The removed materials shall be stacked neatly at the designated position.<br>If there are other materials to be provided by Party A, please write them in the remarks.<br>
正在翻译中..